Guatemala Project

Year:  2019

Rehabilitation of two Segments of DN 250 PN 10 in 10″ Carbon Steel Petroleum Pipeline, Puerto Barrios Terminal

 

This pipeline could not be shut down for more than seven days because the rescheduling of the incoming vessels was not possible.  The total replacement of the pipeline was consequently not an option for the client. Primus Line® DN 250 PN 10 was the best option to minimize cost, avoid downtime and significantly extend the lifespan of the existing pipeline within the seven-day rehabilitation window offered in this location.